Sunday, October 23, 2016

Arrival of Jan and Heinz from Germany!

Jan and Heinz arrived on the 6th of July to help finish the towers and install the solar pump. Jan was here for a week and Heinz stayed a bit longer. They worked solidly all the time they were here to make sure everything would be set up before they left!

Here they are bringing the pipes to the borehole.

Measuring the depth of the borehole.


Starting to put the pipes down.


This is the very end of the pipe, the one that was put down first.

These lines are actually slits through the pipe to allow the water to go through.





Before the pipes were screwed on to each other they would put Teflon tape to secure them.


This was a test to try and find a way to get the second tower up.












Getting ready to put the panels up.


























All the panels have been put up and welded into place!