| These are the pipes that were put in the foundations, to support the roof. |
| Unfortunately the photos are all jumbled and in the wrong order! |
| I think Mel was getting the leaves out of the hole before the concrete was poured! |
| Setting the pipes in place with Denny and Stephan. |
| Working under strict supervision!! |
| The pipes were sitting on these metal plates. |
| Pouring the concrete in the holes. |
| Welding the pipe on the metal plate. |
| Leveling the holes. |
No comments:
Post a Comment